Retrofit Existing Buildings - Save Energy

Manufacturing Plant - Boiler Retrofit




FACILITY: Clothing Manufacturing Plant - Chicago, IL





PROBLEMS:

  • Old gas-fired boiler system was expensive to maintain and operate.
  • Higher gas bills and increased operating costs reduced company profits.
  • Uneven heating throughout the 126,000 sq. ft. building.
  • Very cold dock door areas caused worker complaints.
  • Poor winter/summer ventilation.

SOLUTIONS:

  • Local heating contractor recommended and installed Thru-Wall, Cambridge Blow-Thru® Space Heaters around the perimeter of the brick building.
  • Cambridge included this facility in their unique Building Study Program where customer gas bills are collected and loggers are installed to monitor temperatures throughout the building.

RESULTS:

  • Fuel usage declined 62%.
  • Cambridge heaters required much less maintenance.
  • Warm, balanced temperatures were achieved throughout the building, even at the dock doors.
  • Improved ventilation and indoor air quality.
  • Lower gas bills and lower maintenance costs resulted in a 2-year payback. After that, the savings went straight to the bottom line to increase company profits.

LEARN MORE >
Magazine Article: "Best Practices Award - Energy"

 


CUSTOMER COMMENTS:

The Heating Contractor said:

  • "I've used Cambridge equipment in the past. I like its patented Blow-Thru® burner design that is small, compact, easy to install and puts out lots of heat."


  • "As a contractor, I know Cambridge will stand behind their product."


  • "It is approved by the City of Chicago and has a great warranty."

The Facilities Manager said:

  • "The heaters are virtually maintenance free which is a big improvement from our old boiler heating system."


  • "We now have warm dock door areas which used to be a big problem."


  • "We also use the Cambridge units for ventilation."

Retrofit Existing Buildings - Save Energy

Distribution Center - Air Turnover Retrofit




FACILITY: Distribution Center - Columbus, OH





PROBLEMS:

  • The existing large air turnover heating system created employee complaints in their 4-year old, 40 ft. tall, 340,000 sq. ft. building.
  • Extremely cold dock conditions.
  • Hot, uncomfortable upper mezzanine level during the winter.
  • The 4 large indirect-fired heating units occupied valuable floor space.
  • Very noisy system.
  • High operating costs because this large heating system was "running continuously."

SOLUTIONS:

  • Retrofit their building with a more effective and efficient Cambridge Heating System that consisted of 5 suspended Blow-Thru® space heaters above the dock areas, which despite their small size are capable of heating the entire building.



What They Had:
  • Air Turnover heating system
  • 17,500 MBH input
  • 100 HP usage (continuous)


What They Have NOW:
  • Cambridge Blow-Thru® Heating System
  • 10,325 MBH layout
  • 37.5 HP usage (intermittent)
  • 55,000 CFM

RESULTS:

  • Very satisfied employees.
  • Comfortable dock conditions and mezzanine temperatures.
  • Additional valuable warehouse floor space is now available.
  • Much quieter system and improved work environment.
  • Cambridge heaters required less maintenance.
  • Lower operating costs and improved productivity enabled the owner to pay for the replacement system within 1 1/2 years. After that, savings went straight to the bottom line to increase company profits.

Learn More >
Retrofit Building Case Study Program


CUSTOMER COMMENTS:

The Director of Distribution Support & the Maintenance Manager said:

  • "Our people are happy with the new Cambridge Blow-Thru® space heaters."


  • "We met our payback goal."


  • "It's much more comfortable in the dock and mezzanine areas."

  • "We are now considering retrofitting other buildings in our 3 million sq. ft. complex with Cambridge Heaters."