Home
Case Studies
Overview
Customer Solutions
< Warehouse/
Distribution
< Manufacturing Plant
< Retrofit
< Sports Facility
< Auto Service
< Carwash
< Restaurant
< LEED/Green
Testimonials
< Energy Savings
< Lowest Total Costs
< 30 Year Customer
Comparison Studies
< Boilers
< Unit Heaters
< Air Turnover
< Infrared (Radiant)
< Direct-Fired
(100% MUA)
< Direct-Fired
(80/20 MUA)


Case Studies
Overview
Customer Solutions
< Warehouse/
Distribution
< Manufacturing Plant
< Retrofit
< Sports Facility
< Auto Service
< Carwash
< Restaurant
< LEED/Green
Testimonials
< Energy Savings
< Lowest Total Costs
< 30 Year Customer
Building Study
Program
< U.S. Facility
< Canadian Facility
< Comparative Studies
< Retrofits
Comparison Studies
< Boilers
< Unit Heaters
< Air Turnover
< Infrared (Radiant)
< Direct-Fired
(100% MUA)
< Direct-Fired
(80/20 MUA)

Distribution Center - Cleveland, OH
| BUILDING DETAILS: | |
| Size: | 121,000 sq. ft. x 27 ft. high |
| Construction: | R-20 Roof
R-11 Walls |
| OPERATING CONDITIONS: | |
| Operating Hours: | 24 hrs/day 5 days/wk |
| Design Temperature: | 65°F @ 0°F |
| Thermostat Settings: | 63°F weekdays
60°F weekends |
| Heating System: |
|
RESULTS:
(5) Temperature loggers placed throughout the distribution center confirm that only (2) wall mounted Cambridge heaters maintain an even 63°F temperature during weekdays and 60°F setback on weekends during the winter. Temperature variances within the building were only 2°F wall-to-wall and 4°F floor-to-ceiling despite outdoor temperatures fluctuating from 18°F to 59°F. Actual gas consumption was only $0.08/sq. ft. for the heating season (Gas@ $0.50/therm).